Crew applied 6 layers of membrane to the exterior of the basement wall. Guys had to spend a lot of time in the narrow slot (less than 2 feet) between basement wall and dirt. 20 yards of gravel arriving tomorrow for the perimeter drain tile. Then backfill will start in the next day or two.
No comments:
Post a Comment