The dormer started to get framed up this week. Also, the roof is getting decked. The drain lines for the plumbing are going in too. The electrician came this week and moved the panel and re-mounted it temporarily in a different spot, so the wall could be sheared up under the panel. Oh and the basement was stucco'd over a week ago. Looks great! John is working on installing the window in the basement. The house windows will be installed this week too, John is holding one up in the photo.
The air quality has been horrible in Sacramento from all the fires. My temporary wall is doing little to keep it out! But we are still surviving in our little living space :)) Have a great 4th of July! LL